Technical indicators
More than 30 projects completed
31,000 m2 built
Produced 5,800 m3 of reinforced concrete
30 employees
Indicators on terms

"Atyrau" Bridge in Astana:

5 months instead of 9 months

General contractor in the Koktobe City, 2nd round:

18 months instead of 24 months

Economic indicators

"Atyrau" Bridge in Astana:

960 mln KZT with the budget of 1,640 mln KZT

Zelenyi Kvartal (Green Quarter):

210 mln KZT with the budget of 460 mln KZT

Jobs
Design Department requires a leading engineer of the technology department for designing the linear part of pipelines.

Job description:

Development of the project for the linear part of trunk, distribution, field pipelines, implementation of plans and longitudinal sections. Preparation of the TX working drawings for site components (crane units, start-up/receiving units for cleaning devices), including specifications and bill of quantities. To carry out the works on the author's supervision for construction on issues within its competence.

Requirements:

Experience in the oil and gas industry. Knowledge of the regulatory documentation of the Republic of Kazakhstan and international standards. Knowledge of AutoCad, Civil, GeoSolution (GeoSeries)

Terms:

Salary shall be established by the results of the interview. Work schedule: full time from 8.30 to 17.30.

Production and Technical Department Engineer

Job description:

Filling out the forms, schedules. Engineering support during construction.

Requirements:

Experience in construction companies, technical background, knowledge of estimation programs, ability to read the drawings and blueprints.

Terms:

Salary shall be established by the results of the interview. Work schedule: full time from 8.30 to 17.30